Skip content

Search for a WIRS accredited self-lay organisation or WIRSAE provider

We operate the Water Industry Registration Scheme (WIRS) on behalf of water utility companies and the WIRSAE accreditation on behalf of Market Operator Services Ltd (MOSL) and water wholesalers.

A WIRS accredited self-lay organisation may perform works on the connection of water mains and supplies to a property, dependent on the status and scope of accreditation.

A WIRSAE Provider contracted by retailers to carry out accredited work (as defined in the Wholesale Retail Code and detailed in the generic code of practice supplemented by adopting utilities addendums) can be accredited under this scheme. Those Adopting Utilities within England that recognise this scheme will allow WIRSAE Providers that hold the appropriate scopes of accreditation to tender for, and if successful undertake temporary / permanent disconnections and meter installation / replacement works.

1 251 251 results

Filter by

  • Morrison Construction Ltd

    Regions Scotland

    WIRS

    CMS Construction of Mains and Services (all works)

    Contact

    Iain Mitchell

    Contact

    Drew Mackie

  • W M Donald Ltd

    Regions Scotland

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CNRBC Construction Non-Routine Basic Branch Mains Connections

    CNRCC Construction Non-Routine Complex Mains Branch Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Rachel O’Donnell

  • S&R Construction Ltd - MURS Accredited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Design

    Contact

    Danny Scholes

  • William Davis

    Regions Midlands

    WIRS

    CS - Construction of Services

    Contact

    Richard Halford

  • E&H Building Contractors Ltd

    Regions Scotland

    WIRS

    CMS Construction of Mains and Services (all works)

    Contact

    Drewie Manson

  • Total Pipeline Technology Civil Engineering Ltd

    Regions Scotland

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CNRBC Construction Non-Routine Basic Branch Mains Connections

    CNRCC Construction Non-Routine Complex Mains Branch Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Ian Creamer

  • RPS Environmental Management Ltd - WIRSAE

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    TDNHS

    Temp Disconnections & Re-Connections (up to and including 40mm φ)

  • F W Huxter Groundworks and Civil Engineering Ltd.

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

  • Morrison Data Services - WIRSAE

    Regions East Anglia, Midlands, North East, North West, Scotland, South East, South West, Wales

    WIRS

    ARMIM All Routine Meter Installation Maintenance

    ARMIM Temp disconnections/reconnections

    Contact

    Mr Matthew Barnes

  • JWA Pipework Solutions Ltd

    Regions Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Jay Ashford

  • Galldris Services (trading as Galldris Construction Ltd.)

    Regions Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    PM

    Contact

    Chris Turok-Hallam

  • GS Energy Connections Ltd

    Regions Midlands, National, North East, North West, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Contact

    Danny Dunstan

  • Complete Moling Services Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    Contact

    Adam Thompson

  • A S Pipelines

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Andrew Croft

  • Davidson Land Services

    Regions Scotland

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CNRBC Construction Non-Routine Basic Branch Mains Connections

    Contact

    Malcolm Davidson

  • Engage Services (ESL) Limited - WIRSAE

    Regions Midlands, National, North East, North West, Scotland, South East, South West, Wales

    WIRS

    TDNHS

    Temp Disconnections & Re-Connections (up to and including 40mm φ)

    ERMIM External Routine Meter Installation Maintenance

    Contact

    Neil Taylor

  • GW Cockburn Water and Drainage Services

    Regions Scotland

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CNRBC Construction Non-Routine Basic Branch Mains Connections

    Contact

    Mr Gary Collins

  • Perch Verify Ltd - WIRSAE

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    TDNHS – Temp Disconnections & Re-Connections (up to and including 40mm)

  • Pro Weld

    Regions Midlands, National, North East, North West, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CNRBC Construction Non-Routine Basic Branch Mains Connections

    CNRCC Construction Non-Routine Complex Mains Branch Mains Connections

    Contact

    Allan Davidson

  • Capelwood Utilities Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMA – Construction of Mains All

    CS - Construction of Services

    CRMC Construction of Routine Mains Connections

    Contact

    Tristan Epps

  • M.J. ABBOTT LIMITED

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Adrian Riggs

  • Harlaxton Engineering Services Ltd - MURS Accredited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Design

    Contact

    Richard Hibbert

  • Applebridge Utilities Ltd - MURS Accredited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Contact

    Tomas McGleenan

    Notes

    NERS = Excavation and backfill to tile tape level as relevant to cable lay scopes (Civil Works). GIRS = CNRB Scope restricted to work up to 2 Bar.

  • Domis Utilities Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Lee Dunn

  • Natta Building Company Limited

    Regions Midlands, South East, South West

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Contact

    Utilities

  • Seivwright Brothers Ltd

    Regions Scotland

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CNRBC Construction Non-Routine Basic Branch Mains Connections

    CNRCC Construction Non-Routine Complex Mains Branch Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Alasdair Seivwright

  • Onsite Central Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    Contact

    Catherine Henderson

  • Doocey Group Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Contact

    James Ashcroft

  • Radius Subterra

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Garvan Kelly

  • Interactive Contact & Resolution Ltd - WIRSAE

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    TDNHS – Temp Disconnections & Re-Connections (up to and including 40mm)

    Contact

    Richard Denny

  • Sustainable Energy Connections Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Contact

    Andrew Holland

  • J Geraghty Limited

    Regions Midlands, National, North East, North West, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Contact

    Jonjo Geraghty

  • Montore Construction Limited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    Contact

    Dan Sutton

  • NG Tunnelling Ltd

    Regions East Anglia, South East

    WIRS

    CMS Construction of Mains and Services (all works)

    Contact

    Peter Gallagher

    Notes

    13/06/2024 Suspended

  • Water Supply Surveys Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Stephen Elliott

    Contact

    Kane Trayling

  • Heneghan and Sons Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    James McDermott

  • Draper Civil Engineering Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMA – Construction of Mains All

    CS - Construction of Services

    Contact

    Edward Parv

  • Excalon Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    Contact

    Danny Wilson

  • Multi Connex Networks Ltd - MURS ACCREDITED

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

  • Kier Integrated Services Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Design

    Contact

    KIS Proposals

  • PJ Carey (Contractors) Ltd

    Regions Midlands, National, North East, North West, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Matt Larham

  • Argon Utility Infrastruture Limited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    Contact

    Beth Taylor

  • Trust Utility Management Limited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

  • Nexus Utilities Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    John Gaughan / Stephen Gaughan

    Notes

    Administration September 2025

  • SmOp CT Ltd (trading as SmOp Cleantech)

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Contact

    Craig Morton

    Notes

    Civil Works - Excavation and Backfill to Tile Tape Level

  • Utility Infrastructure Solutions - MURS Accredited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Contact

    Chris Grayson

    Notes

    GIRS:- Connections (Non-Routine) Basic - Recommended for partial certification (restricted to work up to 2Bar only)

  • AC Water Connections Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Contact

    Claire Lineham

  • Mulholland Contracts Ltd - MURS Accredited

    Regions Scotland

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CNRBC Construction Non-Routine Basic Branch Mains Connections

    CNRCC Construction Non-Routine Complex Mains Branch Mains Connections

    Contact

    Scott Lambie

  • Fulcrum - MURS Accredited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Design

    Contact

    Customer Care

  • ARC-Tech MU Ltd - MURS Accredited

    Regions Scotland

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CNRBC Construction Non-Routine Basic Branch Mains Connections

    CNRCC Construction Non-Routine Complex Mains Branch Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Design

    Contact

    David Hunter

  • WSP UK Limited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    Design

    Contact

    Tim Knobbs

  • Cascade Water Services Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMA – Construction of Mains All

    CS - Construction of Services

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Matthew Hedges

  • Networx Utilities Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Matt Brimicombe

  • Self-Lay Services Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Toby Judge

  • Naylor Power Engineering Ltd - MURS accredited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMA – Construction of Mains All

    CS - Construction of Services

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Matthew Spink

  • Air Utilities Ltd - MURS Accredited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Muhammad Asfund Yar Khan

  • Dewhurst Utility Services Ltd -MURS Accredited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Design

    Contact

    Jason Critchley

    Contact

    Bill Jones

    Notes

    GIRS - Connections (Non-Routine) Basic (Scope limited to projects up to 2Bar)

  • Swat Utilities Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    Contact

    Jake Pariente

  • Skanska Construction UK Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    PM

    Contact

    Raj Kumar

  • Utility Solutions Provider Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Neal Cowdell

  • Prestige Utilities Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Stuart Hunter

  • Electricity Asset Service Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    Design

    Contact

    Stewart Herron

  • GF Job

    Regions Scotland

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Design

    Contact

    Ruaridh Stuart

  • Hydrotech Water Services UK Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Vince Keenor

  • Morris & Bert Water Solutions Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Steve Morris

  • Sapphire Utility Solutions Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    Contact

    John Glover

    Notes

    Partial Accreditation - Excavation and backfill to tile tape level (Civil Work) – as relevant Cable Laying – 20kV, 33kV

  • Pat Munro Construction Ltd

    Regions Scotland

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CNRBC Construction Non-Routine Basic Branch Mains Connections

    CNRCC Construction Non-Routine Complex Mains Branch Mains Connections

    Contact

    Gary Clark

  • Hulley and Kirkwood Consulting Engineers Ltd

    Regions Scotland

    WIRS

    Design

    Contact

    William Fitzpatrick

  • Infrastructure Gateway - MURS Accredited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Design

    Contact

    Ben Brownbill

  • BGS Group Ltd (BGS Investment Holdings Ltd.)

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Jonathan Hopkins

  • PTS Utilities Ltd

    Regions Scotland

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CNRBC Construction Non-Routine Basic Branch Mains Connections

    CNRCC Construction Non-Routine Complex Mains Branch Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Richard Paton

  • Network Plus Services Limited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Assurance Team

  • Special Pipeline Services Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Mick Rice

  • Ingenious Power Engineering Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    PM

    Contact

    Jason Johnson

  • Dwr Water Solutions Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    Contact

    Harri Pritchard

  • Future Energy Networks Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Bret Murphy

  • Kilkern Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Design

    Contact

    Martin Gallagher

  • Integrated Utility Services - MURS ACCREDITED

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Design

    Contact

    Integrated Utility Services Ltd

    Notes

    Civil Works Associated with Cable Laying (LV, 11kV, 20kV, 33kV & 66kV)

  • JRN Contractors Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    James Nelson

  • Dig & Connect Water Services Ltd.

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMA – Construction of Mains All

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Mark Aldous

  • JRF Utilities Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Friday Mafararikwa

  • Utilities Direct Limited

    Regions East Anglia, Midlands, South East, South West

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Design

    Contact

    Loretta Gobbey

  • Ameon Utilities Ltd - MURS Accredited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Martin Quinn

  • Versatile Utilities Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Wayne Gould

  • Megson Utilities Limited - MURS accredited

    Regions Midlands, North East, North West, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Kevin Megson

    Notes

    (Civil Work) – as relevant to Construction: Cable Laying – LV, 20kV.

  • DAM Utilities Ltd - MURS Accredited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

  • Alconex Infrastructure & Solutions Ltd - MURS Accredited

    Regions Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Contact

    Kevin Wilkinson

  • K M Plant Hire & Groundworks Ltd

    Regions Midlands, National, North East, North West, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    Contact

    Murray Ambler-Shattock

  • Occutrace Ltd - WIRSAE

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    MIRMS

    Installation or replacement of meter in chamber/box up (to and including 40mm φ)

    ERMIM External Routine Meter Installation Maintenance

    TDNHS – Temp Disconnections & Re-Connections (up to and including 40mm)

    ERMIM - Temporary Disconnections and Subsequent Reconnections

    MIAES - Installation or replacement meter in existing chamber / inside building up to and including 40mm

    MIAEL - Installation or replacement meter in existing chamber / inside building over 40mm.

    Contact

    David McKenzie

  • M&J Utility Services Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Jonathan Buxton

  • Quantum Power Connections Ltd - MURS Accredited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

  • John Gunn & Sons Ltd

    Regions Scotland

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Contact

    Ian Gunn

  • Pressure Test scotland (Water) Ltd

    Regions Scotland

    WIRS

    CMA – Construction of Mains All

    CS - Construction of Services

    CRMC Construction of Routine Mains Connections

    CNRBC Construction Non-Routine Basic Branch Mains Connections

    Contact

    David Connell

  • SNR Eng Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    Design

    Contact

    Richard Kibbler

  • M Group Water (Network Infrastructure) Limited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Contact

    Andy Stephenson

  • Chap Group (Aberdeen) Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Neil Mutch

  • ML Water Solutions Ltd

    Regions Scotland

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CNRBC Construction Non-Routine Basic Branch Mains Connections

    CNRCC Construction Non-Routine Complex Mains Branch Mains Connections

    Contact

    Richard Moffat

  • ACS Multi Utility Ltd - MURS accredited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Design

    Contact

    Alister Cameron

  • JN Civils Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Contact

    Antony Livingstone

  • AIM Utilities Ltd - MURS Accredited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Simon Barton

  • Claret Civil Engineering Ltd

    Regions East Anglia, Midlands, North East, North West, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Kevin Potter

  • Hydrosave UK Ltd

    Regions Midlands, National, North East, North West, Scotland, South East, South West, Wales

    WIRS

    ARMIM All Routine Meter Installation Maintenance

    CMA – Construction of Mains All

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CNRBC Construction Non-Routine Basic Branch Mains Connections

    CNRCC Construction Non-Routine Complex Mains Branch Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    ERMIM External Routine Meter Installation Maintenance

    Contact

    Mr Keith Lewcock

  • Amjutan Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Design

    Contact

    Mr Justin Woodbridge

  • United Living Water Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Contact

    Chris Carolan

  • Phoenix Utilities Ltd - MURS Accredited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CNRBC Construction Non-Routine Basic Branch Mains Connections

    CNRCC Construction Non-Routine Complex Mains Branch Mains Connections

    Design

    Contact

    Mr Kenny Nicol

  • OCU Services Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    Contact

    James Probert

  • Total Utility Connections Ltd - MURS Accredited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Design

    Contact

    Catherine Rowlands

  • L J Heffernan Utilities Ltd - MURS Accredited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Luke Heffernan

  • Entity Connect

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Contact

    Gethin Davies

  • Rosgal Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

  • The Clancy Group Limited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    Design

    Contact

    Malcom Hazel

    Notes

    .

  • Longsword Building and Maintenance Services Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

  • Anparo Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Contact

    Adam Ferrand

  • Bregan Mainsflow Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Glenn Brett

  • Firdale Construction Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

  • Fincher Utilities Limited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

  • Therma Mech Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Alex Sargeant

  • AS-Utilities Scotland Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMA – Construction of Mains All

    CS - Construction of Services

    CRMC Construction of Routine Mains Connections

    CNRBC Construction Non-Routine Basic Branch Mains Connections

    CNRCC Construction Non-Routine Complex Mains Branch Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Scott Peters

  • Alexander James Contracts Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

  • Shannon Utilities Ltd - MURS Accredited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Ben Webb

  • DaCI Utilities Engineering Consultancy Ltd - MURS Accredited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    Design

    Contact

    Mohammad Hasan

  • Water and Pipeline Services Ltd

    Regions Scotland

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CNRBC Construction Non-Routine Basic Branch Mains Connections

    CNRCC Construction Non-Routine Complex Mains Branch Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Design

    Contact

    Donald Stocks

  • Shadow Utilities Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Friday Mafararikwa

  • CLC Utility Services Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Contact

    Freddie Box

    Contact

    Thomas Stoten

  • PWG Connections Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Notes

    Network Connections Operational – LV and 11kV (includes 20kV) Network Connections Jointing – 11kV mains and 11kV Terminations (includes 20kV)

  • High Voltage Systems and Services (HVSS)

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Design

    Contact

    Mark Buckby

    Contact

    Chris Beattie

  • Billy Miller Contractor & Plant Hire

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CS - Construction of Services

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Contact

    Brad Robert Macleod

  • UK Utility Connections Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Tom Pitts

  • Andrew Sinclair Ltd

    Regions Scotland

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CNRBC Construction Non-Routine Basic Branch Mains Connections

    CNRCC Construction Non-Routine Complex Mains Branch Mains Connections

    ERMIM External Routine Meter Installation Maintenance

    Design

    Contact

    Bruce Sinclair

  • Stantec UK Ltd

    Regions Midlands, National, North East, North West, Scotland, South East, South West, Wales

    WIRS

    Design

    Contact

    Paul Kalungi

  • Vital Energi Utilities Limited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Design

    Contact

    Tim McNeilly

  • Jardine Utilities Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CNRBC Construction Non-Routine Basic Branch Mains Connections

    CNRCC Construction Non-Routine Complex Mains Branch Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Tom Jardine

  • Matrix Networks Ltd - MURS Accredited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Contact

    Simon Spencer

  • JSM Group Services Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    Contact

    Darren Cooper

  • Mott Macdonald

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    Design

    Contact

    Stephen Kirby

  • Bethell Utility Services Ltd - MURS Accredited

    Regions Midlands, North East, North West

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Design

    Contact

    Sarah Standish

  • Avove Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Design

    Contact

    Liz Groundland

  • WaterWise Utilities Ltd (formerly DS Construction (Scotland) Ltd )

    Regions Scotland

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CNRBC Construction Non-Routine Basic Branch Mains Connections

    CNRCC Construction Non-Routine Complex Mains Branch Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

  • Chapman Civil Engineering Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Contact

    Paul Chapman

  • Watertight Management Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Contact

    Paul Castle

  • FES Support Services Ltd - MURS Accredited

    Regions Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CNRBC Construction Non-Routine Basic Branch Mains Connections

    CNRCC Construction Non-Routine Complex Mains Branch Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Design

    Contact

    Chris Mack

  • GTC Infrastructure Ltd - MURS Accredited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CNRBC Construction Non-Routine Basic Branch Mains Connections

    CNRCC Construction Non-Routine Complex Mains Branch Mains Connections

    Design

  • DJM Services (Pembs) Ltd

    Regions Midlands, National, North East, North West, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Darrell Lewis

  • Green Frog Utilities

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Green Frog Utilities

  • Underground Solutions Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMA – Construction of Mains All

    CS - Construction of Services

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

  • Advance Utilities (Scotland) Ltd - MURS Accredited

    Regions Scotland

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CNRBC Construction Non-Routine Basic Branch Mains Connections

    CNRCC Construction Non-Routine Complex Mains Branch Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Design

    Contact

    David Callaghan

  • EOS Solutions UK Plc

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    ARMIM Temp disconnections/reconnections

    Contact

    Steve Ridge

  • GasDesign Utilities Ltd Trading as GDUK (Utilities)

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    Design

    Contact

    Andy Ginn

  • Allan Munro Construction Ltd

    Regions Scotland

    WIRS

    CMS Construction of Mains and Services (all works)

    Contact

    Cameron Munro

  • Energy Assets Utilities Ltd - MURS Accredited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CNRBC Construction Non-Routine Basic Branch Mains Connections

    CNRCC Construction Non-Routine Complex Mains Branch Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Craig Smith

  • Flowaime Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    Contact

    Andrea Wright

  • Tulloch Developments Ltd

    Regions Scotland

    WIRS

    CMS Construction of Mains and Services (all works)

    Contact

    Shaun Tulloch

  • HydroVein (North Avon Group) Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Contact

    James Probert

  • Gattica Associates Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    Design

    Contact

    Mihaela Gafita

  • FCH Construction Services Ltd

    Regions Scotland

    WIRS

    CMS Construction of Mains and Services (all works)

    Contact

    Fraser Hart

  • Reach Active Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    PM

  • PN Daly Ltd - MURS ACCREDITED

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Design

    Contact

    Patrick Daly

  • Pipework Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Tom Vallely

  • Innovative Utilities Ltd

    Regions Midlands, National, North East, North West, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CNRBC Construction Non-Routine Basic Branch Mains Connections

    Contact

    Mr John Mason

  • Ipswich Utilities Limited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMA – Construction of Mains All

    CS - Construction of Services

    CRMC Construction of Routine Mains Connections

    Contact

    Jordan Thomas

  • Civils Plus Plant and Utilities Ltd

    Regions Midlands, National, North East, North West, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Contact

    Rachel Carroll

  • OCU Utility Services Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMA – Construction of Mains All

    CS - Construction of Services

    CRMC Construction of Routine Mains Connections

    Contact

    James Probert

  • Nicol of Skene Ltd - MURS

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CNRCC Construction Non-Routine Complex Mains Branch Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Peter-Jon Cowe

  • IES Utilities Group

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

  • Connect It Utility Services Limited - MURS Accredited

    Regions Midlands, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Design

    Contact

    Ryan Leech

  • JPS Utilities (Scot) Ltd

    Regions Scotland

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CNRBC Construction Non-Routine Basic Branch Mains Connections

    CNRCC Construction Non-Routine Complex Mains Branch Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Lesley Allan

  • Power On

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMA – Construction of Mains All

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Design

    Contact

    Tim Erich

  • Pipeline Associates Ltd

    Regions South East, South West

    WIRS

    CMA – Construction of Mains All

    CS - Construction of Services

    Contact

    Dan Woolmington

  • DT Civils Ltd - MURS Accredited

    Regions East Anglia, Midlands, North East, North West, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Contact

    Dean Sibley

  • OPUS Utility Solutions Limited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Gavin O’Connor

  • M X Construction Limited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMA – Construction of Mains All

    CS - Construction of Services

  • Arcadis Consulting (UK) Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    Design

    Contact

    Gareth Thompson

  • Utilitest Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CNRBC Construction Non-Routine Basic Branch Mains Connections

    CNRCC Construction Non-Routine Complex Mains Branch Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Design

    Contact

    Alan Macmillan

  • SAS Utility Services Ltd

    Regions Midlands, National, North East, North West, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Mr Stephen Smith

  • GCB Utilities Ltd

    Regions East Anglia, Midlands, North East, North West, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Craig Bennett

  • Beehive Contractors Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

  • Energetics Design and Build Limited - MURS Accredited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Design

    Contact

    Lee Crabtree

    Notes

    Civil Works associated with the following scopes: Cable Laying (LV, 11kV, 20kV) Cable Jointing (LV Dead, LV Live, 11kV, 20kV) Substation Installation (11kV, 20kV)

  • MCU Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Contact

    Mick Coleman

    Notes

    NERS Cable Laying (LV) *restricted to hand pull only

  • Aptus Utilities - MURS ACCREDITED

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Design

    Contact

    Enquiries Team

    Notes

    GIRS Connections (Non-Routine) Basic - restricted to projects up to 2 Bar

  • Pearce Elite Plumbing & Heating Limited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    Contact

    Matthew Duggan

  • Severn Trent Services

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMA – Construction of Mains All

    CS - Construction of Services

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Nathan Beauchamp

  • Aquamain (UK) Ltd

    Regions Midlands, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Design

    Contact

    Luke Welch

  • Excel Pipelines T/A ExcelCS

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    Contact

    Mark Barnes

  • O'Halloran & O'Brien Limited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Contact

    David Briddon

  • Express Utilities Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CS - Construction of Services

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Contact

    Kerry McDade

  • Balfour Beatty plc

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    Design

    Contact

    Steve Crossland

  • Luce Bay Plant Hire Ltd

    Regions Scotland

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CNRBC Construction Non-Routine Basic Branch Mains Connections

    CNRCC Construction Non-Routine Complex Mains Branch Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

  • Pipeline Energy Solutions Ltd

    Regions Scotland

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Notes

    NERS Tier 2 Company

  • Dumfries and Galloway Utility Company Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Ian Carruthers

  • USR Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

  • Hydro Utility Solutions Ltd

    Regions Midlands, National, North East, North West, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Contact

    Mr Tim Stork

  • The ICP

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

  • J McCann & Co Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    James McDaid

  • PowerTek Utilities Ltd - MURS Accredited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CNRBC Construction Non-Routine Basic Branch Mains Connections

    CNRCC Construction Non-Routine Complex Mains Branch Mains Connections

    Contact

    Fraser Baxter

  • Global Infrastructure Scotland Ltd

    Regions Scotland

    WIRS

    CMS Construction of Mains and Services (all works)

    Contact

    Tanya Bartlet

  • Complete Utility Services Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Contact

    Damon Goodwin

  • TriConnex Ltd - MURS Accredited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Design

    Contact

    Hannah Smith

  • UB Civils Ltd

    Regions Scotland

    WIRS

    CMS Construction of Mains and Services (all works)

    Contact

    Colin Peteranna

  • Erith Connect Ltd - MURS accredited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

  • Stats Utility Connections Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    PM

    Design

    Contact

    Neil Kempton

  • Bottom Groundworks & Plant Hire Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CNRBC Construction Non-Routine Basic Branch Mains Connections

    CNRCC Construction Non-Routine Complex Mains Branch Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Brian Campbell

  • M&S Water Services (Utilities) Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Thomas Harkin

  • CONNECT3UK LTD

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMA – Construction of Mains All

    CS - Construction of Services

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Ainsley McLaughlin

  • TGL Group Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

  • Energy Flow Utilities Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Stuart Hunter

  • Heartland Pipelines Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Robert Ellis

  • Pivotal Energy Ltd - MURS Accredited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Contact

    Amie Norton

  • Ipsum Power (ICP) Limited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Lucy Jarrett

  • J.S. Pipelines Limited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMA – Construction of Mains All

    CS - Construction of Services

    Contact

    Jamie Smith

  • McAndrews Utilities and Civil Engineering

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Sean McAndrew

  • Fusion Utility Networks

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    James Smith

  • Talbot Pipelines Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Matthew Talbot

  • Waterco Ltd

    Regions Midlands, National, North East, North West, Scotland, South East, South West, Wales

    WIRS

    Design

    Contact

    Accounts

  • Balfour Beatty Utility Solutions Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    Notes

    Water enquiries Kathryn Vowles, contact details as above. Gas enquiries Willie Duncan, contact details as above.

  • MCD Utility Solutions Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    Design

    Contact

    Donovan Aylott

  • Terrafirma Pipeline Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CRMC Construction of Routine Mains Connections

    CMS – Construction of Mains and Services (site works only)

    Contact

    Ivor Wells

  • UK Power Solutions Ltd - MURS Accredited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Design

    Contact

    Brian Cooke

  • TSL Contractors Ltd

    Regions Scotland

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CNRBC Construction Non-Routine Basic Branch Mains Connections

    Contact

    Robert Forbes

  • McFadden Utilities Limited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Sean Staines

  • Electricity Solutions Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Kevin Bergin

  • PBU (UK) Ltd - MURS Accredited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    Contact

    Kevin Wilkinson

  • PGL Pipelines Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Steve Davis

  • EEMU Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMA – Construction of Mains All

    CS - Construction of Services

  • J Murphy and Sons Ltd - MURS Accredited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Contact

    Sam Polley

    Notes

    Full accreditation for Substation Layouts (11kV, 20kV, 33kV – restricted to 33kV switchgear)

  • AIS Utilities Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Contact

    Stuart Newton

  • Underline Utilities & Civil Engineering Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Contact

    Michael Plausin

  • CMU Infrastructure Ltd incorporating CM Utilities Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Design

    Contact

    CMU Infrastructure Ltd incorporating CM Utilities Ltd

  • Ian Moore Groundworks Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

  • Barhale Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMA – Construction of Mains All

    CS - Construction of Services

    Contact

    Kelly Waters

  • Rogers Civil Engineering Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Natalie Birch

    Notes

    Full Scopes Construction Only - Excludes Project Management

Error

Error

No results found

No results found that match your query

Loading results

Approval Key

full approval

Full Accreditation is granted to Providers who have successfully demonstrated that they have adequately met the schemes requirements with respect to the construction of adoptable assets, these Scopes and Services are highlighted in green when fully accredited.

partial approval

Partial Accreditation is the first stage of accreditation showing Scopes and Services highlighted in blue. It demonstrates that a Provider has the required systems, processes, and procedures in place, but has yet to demonstrate these or is currently unavailable to offer work for surveillance to meet the requirements. Providers with partial accreditation can tender and obtain work for the scopes they hold.

approval due to expire

Scopes highlighted in yellow are fully accredited but are due to expire in less than one month.

gap analysis

Scopes highlighted in aqua are for GAP Analysis, meaning the company has the required systems and procedures to do the work but has yet to demonstrate these or is currently unavailable to offer work for surveillance.

approval expired

Scopes highlighted in fuchsia have now expired or have been suspended.

bim ready

BIM Providers who can demonstrate that they have met the requirements of the BIM Guidance document and the referenced standards but do not currently have BIM projects against which they can demonstrate the implementation of those standards

    WIRS Scopes

    Design

    CMS Construction of Mains and Services - All works
    Covers off-site work and on-site work with pipe diameters over 355mm diameter

    CMS Construction of Mains and Services - Site works only
    Covers work on development sites with mains up to 355mm diameter

    CMS Construction of Services on Development Sites
    This scope covers service laying on connections not exceeding 63mm diameter (OD) including services to new on-site mains laid by others.

    PM
    Procedures in place to manage the work and use companies holding construction accreditation.